Wood Strip Installation |
April 30 to June 17, 2022 |
First Strip
|
|
The green clamps fit a groove routed around the station and hold the strip in place.
The shocks cords hold the strip down against the previous strip.
|
|
The black hooks allow the length of the shock cord to be adjusted as the height of the stack of strips increases.
A small diameter pvc pipe runs along the length of the frame for the hooks to catch.
A 4 inch wide platform, below the hooks, also runs the length of the frame. Strips ready for install are stored there.
Outriggers, adjacent to the platform hold the next strip upside down so that glue can be applied in the groove with the glue gun.
|
|
1st Dark Accent Strip
|
|
1st Arrow Row
|
|
2nd Arrow Row
|
|
Arrow Rows Complete
|
|
Strip Attachement to Stem
On the far right and far left strips ready for glue are visible.
|
|
2nd Dark Accent Strip
|
|
Series of Photos Follows Until the Stripping is Complete
|
|
Stripping CompleteBow Ready for Outer Stem
|
Click Here to return to Abenaki Home Page |